Subway line U3 – construction phase U3/1B – Erdberg Subway Yard

Project Description

 

Project description:
The subway yard at Erdberg was built in the course of the enlargement of the basic subway network by the U3 and U6 lines, with a view to future network extensions.
Total track length: 13,804 m

The following facilities were built:
Control center with interlocking system and rectifier station
Warehouse
Cleaning hall
Maintenance hall
Depot with automotive parking lot above
Washing plant
Escalator cleaning facility
Social facilities and workshop building
Facility for machinery and equipment

The buildings above are reinforced concrete structures, whereas most of the halls were built from precast reinforced concrete elements, other buildings were executed as precast concrete skeleton structures.

Client: Wiener Linien GesmbH & Co KG
Contact person: OBR Dipl. Ing. Schöft, Head of Department
B67 –Bautechnische Angelegenheiten der U-Bahn (Subway Construction/Engineering)
Phone:  +43 1 7909-67000
Project: Subway line U3, building segment 1B, Erdberg subway yard
Project area: Vienna
Net costs: Approx. €48 mill.
Planning period: April 1984 to April 1990
Construction period: June 1985 to January 1990

Scope of works

Traffic planning
Submission planning
Planning the relocation of installations
Tender planning
Detailed planning
Planning of track-side equipment

Structural/construction engineering
Structural pre-design
Construction design as part of the submission planning, calculation of quantities and tender specifications
Execution planning: detailed structural planning, plans for formwork and reinforcement, steel construction plans, detailed design

Architectural design: architect Winkler and U-Bahn group of architects.

 

Category

U-bahn / Straßenbahn

Related Projects: